Patti and I got some feedback about our remodel that wasn't so good! The garage floor was unlevel and unusable! We knew it was a problem for buyers and decided to fix it.
Poor old garage floor has seen its better days. The aggregate below the slab was sand and eroded! The concrete had sunk about 6 inches in the back and sides.
Time to get rid of it!!! Patti was not too thrilled when she heard we had to haul it out!!😟
This time we will use crusher run as our base. About 5 yards!! Patti was not too excited about this either! 😠
Now the fun part. Tamp it down! Now it won't be going anywhere. Add some wire mesh!
We poured the concrete! I used a power screed and was able to level the concrete very quick and easy! Now it's time to float and finish.